|
||
÷ºÎÆÄÀÏ : |
Abstract For the bypass of the city of Kota (Rajasthan), NHAI has planned to make the NH-76 cross the Chambal River. Since this crossing was falling in the ¡°National Chambal Gharial Wildlife Sanctuary¡±, it was decided to cross the 300 m wide river with a single span, and hence reduce crocodile wild life disturbance by avoiding any pier in the river bed. After tender, the turnkey contract was awarded to the construction JV Hyundai-Gammon, on the basis of the solution proposed by Systra. The proposed solution to achieve this goal, was a cable-stayed bridge with a 350 m main span and axial suspension.
Keywords: bridge, stay, cantilever method, geometry, control, construction, wind |
|
¸ñ·Ïº¸±â |
|